Public Notice of the Investigation Report on the Soil and Groundwater Environment Status of the Land for the First Stage of "South China Titanium Valley" Project Phase I
Our company intends to build Phase I of the South China Titanium Valley project in the area XQ-D1-18-01 of West District, Maoming Hi-tech Zone. The facilities to be constructed are a 500,000 tons/year beach placer beneficiation production system and a 500,000 tons/year high-end enriched TiO2 material (synthetic rutile) production system. According to the requirements in the Administrative Measures on the Soil Environment of Industrial and Mining Lands (Decree of the Ministry of Ecology and Environment No. 3). During the preparation of the Environmental Impact Report of the project, the Investigation Report on the Soil and Groundwater Environment Status of the Land for the First Stage of "South China Titanium Valley" Project Phase I was simultaneously prepared, and is now open to the public as required.
Maoming South China Titanium Valley New Material Technology Co., Ltd.
7 August 2024